Product Details:
Payment & Shipping Terms:
|
Material: | ST52.3 ,Q235 | Equipment: | 3150T Open Die Hydropress |
---|---|---|---|
Melting Process: | LF+EF+VD | Production Process: | Forging+heat Treatment+rough Machining |
Foring Ratio: | ≥5 | Max Weight: | 30T |
High Light: | forging stainless steel,super steel forgings |
Alloy steel bearing pedestal ST52.3 forgings,turntable bearing pedestal,flange bearing pedestal
Reference:
Material | ST52.3 ,Q235 |
Equipment | 3150T open die hydropress |
Application |
Bearing pedestal is one kind of special structure and large scale bearing pedestal that can take comprehensive load |
Melting process |
LF+EF+VD |
Production process |
Forging+heat treatment+rough machining |
Foring ratio |
≥5 |
Applicable standard |
ASTM,ASME,DIN,JIS,ISO,BS,API,EN |
Executive standard |
JB/GB/EN/DIN/JIS/ASME/ASTM/ISO |
Certification authority |
ISO,BV,SGS, IST, UL,CTI |
Delivery term |
Rough machining(N+T);finish machining(Q+T) |
Test equipment |
Spectrograph,UT device,tensile and impact test machine,metalloscope,hardness test machine |
Service | Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality. |
Custom properties:
Material elements | C | Si | Mn | P | S | Cr | Ni | Mo |
others |
ST52.3 | ≤0.20 | ≤0.50 | ≤2.0 | ≤0.040 | ≤0.040 | -- | -- | -- | - |
Q235 | ≤0.17 | ≤0.35 | ≤1.40 | ≤0.035 | ≤0.035 |
Mechanical property |
Dia.(mm) |
TS/Rm(Mpa) |
YS/Rp0.2(Mpa) |
EL/A5(%) |
RA/Z(%) |
Type Of notch |
Impact energy |
HBW |
ST52.3 | Ø10 | 470-630 | ≥345 | ≥20 | -- | V | ≥34 | == |
Q235 | Ø15 | 375-460 | ≥215 | ≥24 |
Commerce clause:
Max weight | 30T |
MOQ | 1PC |
Delivery date | 20-50 days |
Package | Wooden case,pallet,iron steel frame |
Delivery term | FOB;CIF;CFR;DDU; |
Payment term | T/T,LC |
Transportation |
Ocean,air |
Keywords:
Bearing pedestal mainly contain:flange bearing pedestal and turntable bearing pedestal,main material is low alloy steel.
Advantage:
Process procedure:
Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment
Contact Person: Mr. Arnold
Tel: +86-15-15-15-81-878
Fax: 86-512-58360318